Line 20 (Shanghai Metro)

Line 20 will be a future subway line on the Shanghai Metro. It will run in an east–west direction in northern Shanghai, connecting Shanghai West railway station in Jiading District to Gongqing Forest Park in Yangpu District, with a possible future extension to Zhouhai Road in northern Pudong. It will be about 20 km (12 mi) long with 10 stations. The line was announced by the Municipal government in 2016.

Line 20
 20 
Overview
Native name上海地铁20号线
StatusUnder construction
LocalePutuo, Baoshan, Jing'an, Yangpu, and Pudong, Shanghai
Termini
  • Jinchang Road
  • Gongqing Forest Park
Connecting lines 1   3   6   7   8   10   11   15   18   19   21 
Stations20
Websitewww.shmetro.com
Service
Type Rapid transit
System Shanghai Metro
Operator(s)Shanghai No. Metro Operation Co., Ltd.
Depot(s)Zhenru depot
Xiangyin Road Parking Lot
Rolling stockClass A 6-car trains
History
CommencedDecember 16, 2022 (2022-12-16)
Planned opening2027 (2027)
Technical
Track length19.8 km (12.3 mi)
Number of tracks2
CharacterFully underground
Track gauge1,435 mm (4 ft 8+12 in)
ElectrificationOverhead lines (1500 volts)
Operating speed80 km/h (50 mph)
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.