Line 21 (Shanghai Metro)
Line 21 will be a future subway line on the Shanghai Metro. It will run in a north–south direction through Pudong, connecting Gaohang in Waigaoqiao to the Disney Resort. The first phase will be about 28 km (17 mi) long with 10 stations. Stations will have passing loops to allow for express and local stopping patterns.
Line 21 | |
---|---|
21 | |
Overview | |
Other name(s) | Line 24 (between 2014 and 2016) |
Native name | 上海地铁21号线 |
Status | Under construction |
Locale | Pudong, Shanghai |
Termini |
|
Connecting lines | 2 6 9 11 12 13 14 |
Stations | 28 |
Website | www |
Service | |
Type | Rapid transit |
System | Shanghai Metro |
Operator(s) | Shanghai Maglev Development Co., Ltd. |
Depot(s) | Liuchen Road Depot |
Rolling stock | Class A 6-car trains |
History | |
Commenced | January 4, 2022 |
Planned opening | 2026 |
Technical | |
Track length | 48 km (30 mi) |
Number of tracks | 2 |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Electrification | Overhead lines (1500 volts) |
Operating speed | 100 km/h (62 mph) |
The line was announced by the Municipal government in 2016. Previous plans in 2014 designated the Disney Resort — Guanglan Road section as Line 24.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.