Pinggu line

Line 22 (Pinggu line) of the Beijing Subway is a rapid transit line under construction in Beijing and Hebei Province.

Pinggu line
 Pinggu 
Construction site of Dingfuzhuang station in June 2021
Overview
Other name(s)Line 22
M22 (planned name)
StatusUnder construction
LocaleChaoyang, Tongzhou and Pinggu districts (Beijing) & Sanhe (Langfang, Hebei Province)
Termini
Stations21
Service
TypeRapid Transit
SystemBeijing Subway
Rolling stock8-car Type D
History
Planned opening2025 (planned)
Technical
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
ElectrificationDual voltage 25 kV 50 Hz AC and 1,500 V DC overhead wire
Route map

Future long-term planning expansion
Dongdaqiao
Line 10 ( inner  outer )
Jintai Xizhao
Line 28 ( Guangqudonglu)
Hongmiao
Ciyunsiqiao
Ganluyuan
Pingfang depot
Dingfuzhuang
Guaanzhuang
Batong line (through operation to Line 1)
Yongshun
Tongzhou Beiguan
Yunhe Shangwuqu
Beijing Sub-Center railway station
Zhengwuzhongxin
Zhengwuzhongxindong
Chaobai River – Boundary
Beijing
Hebei
Yanjiaozhen
Jingha Railway crossing
Jingtang Intercity Railway crossing
Shenweidajie
Chaobaidajie
Gaolou
Yanjiao Depot
Qixinzhuang
Pinggu Local Railway crossing
Boundary
Hebei
Beijing
Mafang
Daqin Railway crossing
Machangying
Pinggu
Pinggu line
Simplified Chinese北京地铁22号线(平谷线)

It will run from Dongdaqiao station in Chaoyang District to Pinggu station in Pinggu District with 21 stations. The length of the line is 81.2 km (50.5 mi), and 53.8 km (33.4 mi) will be underground. The line will use 8-car Type D rolling stock and will open in 2025.

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.