Line 10 (Beijing Subway)

Line 10 of the Beijing Subway (Chinese: 北京地铁10号线; pinyin: běijīng dìtiě shíhào xiàn) is the second loop line in Beijing's rapid transit network as well as the second longest and most widely used line. The line is 57.024 km (35.4 mi) in length, and runs entirely underground through Haidian, Chaoyang and Fengtai Districts, either directly underneath or just beyond the 3rd Ring Road. The Line 10 loop is situated between 2 and 6 kilometres (1.2 and 3.7 mi) outside the Line 2 loop, which circumnavigates Beijing's old Inner City. Every subway line through the city centre intersects with Line 10, which has 24 transfer stations along route, and 45 stations in all. Line 10's color is capri.

Line 10
Route diagram at Jiandemen station
Overview
Other name(s)M10 (planned name)
StatusOperational
LocaleHaidian, Chaoyang and Fengtai districts
Beijing
Stations45
Service
TypeRapid transit
SystemBeijing Subway
Operator(s)Beijing Mass Transit Railway Operation Corp., Ltd
Depot(s)Wanliu, Wulu, Songjiazhuang
Rolling stock6-car Type B (DKZ15, DKZ34, DKZ46)
Daily ridership1,931,000 (First Half of 2018 Peak)
2,076,500 (2014 Peak)
History
Opened19 July 2008 (2008-07-19)
Technical
Line length57.024 km (35.4 mi)
CharacterUnderground
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification750 V DC Third rail
Operating speed80 km/h (50 mph)
Route map

Bagou
Wanliu depot
Wanquan river
Suzhou Jie
connects Line 4
Haidian Huangzhuang
Zhichunli
Zhichun Lu
Jingzhang ICR crossing
Xitucheng
Mudanyuan
Jiandemen
Beitucheng
connects Line 8
Anzhenmen
planned line 8 branch platform
connects Line 8
Huixin Xijie Nankou
connects Line 5
Shaoyaoju
Taiyanggong
Capital Airport Express Terminal 3
line 12 Dongbabei
Sanyuanqiao
Capital Airport Express and Line 12 (to be opened 2024)
line 12 Sijiqingqiao
Capital Airport Express Beixinqiao
Liangmaqiao
Liangma river
Agricultural Exhibition Center
Tuanjiehu
Line 3 (to be opened 2024)
Hujialou
Jintai Xizhao
Line 28 (to be opened 2029)
DongdaqiaoGuangqudonglu
Guomao
Tonghui river
Shuangjing
Jingsong
Panjiayuan
Jingjin ICR crossing
line 14 Shangezhuang
Shilihe
Fenzhongsi
Chengshousi
Songjiazhuang yard
connects Yizhuang line
Songjiazhuang
Shiliuzhuang
Liangshui river
Dahongmen
Line 8 (not open)
Jiaomendong
Jiaomenxi
Caoqiao
Lize Shangwuqu (to be opened 2025)Daxing Airport
Ma'cao river
Jinghu HSR crossing
Jijiamiao
Capital Univ. of Economics & Business
Fengtai railway station (subway)
Niwa
Xiju
Liuliqiao
Jingguang railway Xichang connection
Jingguang HSR crossing
Lianhuaqiao
Gongzhufen
Yongding River diversion canal
Xidiaoyutai
Jingmi diversion canal
Cishousi
Wulu yard
connects Line 6
Chedaogou
Changchunqiao
Line 12 (to be opened 2024)
Huoqiying
Jingmi diversion canal

Line 10 was the world's longest rapid transit loop line since its completion in May 2013 till March 2023 and one of the longest entirely underground subway lines requiring 104 minutes to complete one full journey in either direction.

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.