Line 23 (Shanghai Metro)

Line 23 is an under construction Shanghai Metro line that would run from Shanghai Indoor Stadium in Xuhui District to Minhang Development Zone in Minhang District. Its It is planned to be 29 kilometres (18 mi) in length, and is planned to have 22 stations. The line was announced by the Shanghai municipal government in 2016. It will adopt unmanned driving (GoA4).

Line 23
 23 
Overview
Native name上海地铁23号线
StatusUnder construction
LocaleXuhui, Minhang
Shanghai, China
Termini
Connecting lines 3   4   5   12   15   19 
Stations22
Websitewww.shmetro.com
Service
Type Rapid transit
System Shanghai Metro
Operator(s)Shanghai No. Metro Operation Co., Ltd.
Depot(s)Chengjiang Road depot
Rolling stockClass A 6-car trains
History
CommencedAugust 23, 2022 (2022-08-23)
Planned opening2027 (2027)
Technical
Track length28.5 km (18 mi)
Number of tracks2
Characterfully underground
Track gauge1,435 mm (4 ft 8+12 in)
ElectrificationOverhead lines (1500 volts)
Operating speed80 km/h (50 mph)

The line will not utilise the existing branch Line 5 service between Dongchuan Road and Minhang Development Zone stations, with the line planned to be fully underground. Once complete, it will feature interchange stations with Lines 3, 4, 5, 15, and 19. The construction period of this project is expected to be 74 months.