Line 6 (Shanghai Metro)

Line 6 is an eastern north–south line of the Shanghai Metro network. It opened on December 29, 2007. The entire line is located in the Pudong New Area. A complete trip between the two end terminals, Gangcheng Road and Oriental Sports Center takes approximately 1 hour and 10 minutes. Line 6 has been dubbed the unofficial nickname “Hello Kitty Line” due to its lurid pink livery. The line is colored magenta on system maps.

Line 6
Overview
Other name(s)L4 (planned name);
Pudong line (Chinese: 浦东线);
Pudong light rail (Chinese: 浦东轻轨);
Hello Kitty line (nickname)
Native name上海地铁6号线
StatusOperational
OwnerShanghai Rail Transit Pudong Line Development Co., Ltd.
LocalePudong district, Shanghai, China
Termini
Stations28
Service
Type Rapid transit
System Shanghai Metro
Operator(s)Shanghai No. 4 Metro Operation Co. Ltd.
Depot(s)Gangcheng Road Depot;
Sanlin parking lot
Rolling stock76 Class C 4-car trains
Daily ridership520,000 (2019 peak)
History
CommencedOctober 31, 2002 (2002-10-31)
OpenedDecember 29, 2007 (2007-12-29)
Last extensionApril 12, 2011 (2011-04-12)
Technical
Line length32.318 km (20.08 mi)
Number of tracks2
CharacterUnderground and elevated
Track gauge1,435 mm (4 ft 8+12 in)
ElectrificationOverhead lines (1500 volts)
Operating speed80 km/h (50 mph)
Average speed: 30.1 km/h (19 mph)
SignallingThales’ SelTracTM CBTC
Route map
Route on the Shanghai map:
To scale geographic map:
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.