Line 12 (Beijing Subway)

Line 12 of the Beijing Subway (Chinese: 北京地铁12号线; pinyin: běijīng dìtiě shí'èr hàoxiàn) is rapid transit line under construction in Beijing. The line is 29.6 km (18.4 mi) with 20 stations. It is fully underground. The line between Sijiqingqiao and Dongbabei is planned to open in 2024, due to planning adjustments east of Dongbabei.

Line 12
Construction site of Changchunqiao station in July 2022
Overview
Other name(s)M12 (planned name)
StatusUnder Construction
Termini
Stations20
Service
TypeRapid transit
SystemBeijing Subway
Depot(s)Tiancun, Dongba
Rolling stock8-car Type A
History
Planned opening2024 (planned)
Technical
Line length29.6 km (18.4 mi)
CharacterUnderground
Track gauge1,435 mm (4 ft 8+12 in)
Operating speed80 km/h (50 mph)
Route map

Tiancun yard
Yongding River diversion canal
Sijiqingqiao
Landianchang
Changchunqiao
outer – inner
Jingmi diversion canal
Suzhouqiao
Renmin Daxue (Renmin Univ.)
Dazhongsi
Jingzhang ICR Qinghuayuan tunnel
Xiaoyue river
Jimenqiao
Beitaipingzhuang
Madianqiao
Anhuaqiao
Anzhenqiao
Heping Xiqiao
Guangximen
Dongtucheng ditch
Ba river
Xibahe
connects line 17
Capital Airport Express Beixinqiao
line 10 inner
Sanyuanqiao
line 10 outer
Capital Airport Express Terminal 3
Ba river
Jiangtaixi
Gaojiayuan
Tuofangying
CR Track Test Center
(Beijing circular railway)
Dongbaxi
Dongba depot
Dongbabei
Beixiao river
Caogezhuangbei (future extension)
Dongba Beijie (future extension)
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.