Sungai Besi–Ulu Klang Elevated Expressway

The Sungai Besi–Ulu Klang Elevated Expressway (SUKE) Sungai Besi–Ulu Klang Elevated Expressway is a 24.4-kilometre (15.2-mile) three-laned, dual carriageway, controlled-access highway in Kuala Lumpur and Selangor, Malaysia. The expressway will run on top of the existing Kuala Lumpur Middle Ring Road 2 between Sungai Besi and Ulu Klang, with the intent of reducing traffic along the road.

Sungai Besi–Ulu Klang Elevated Expressway
Lebuhraya Bertingkat Sungai Besi–Ulu Klang
Route information
Maintained by Prolintas
Length24.4 km (15.2 mi)
Existed2012–present
HistoryOpened in stages from:

Phase 1: 16 September 2022 (DUKE Highway-CKE Highway).

Phase 2: 16 June 2023 (CKE Highway-KESAS Highway)
Major junctions
North end FT 28 Kuala Lumpur Middle Ring Road 2
Duta–Ulu Klang Expressway Duta-Ulu Klang Expressway (DUKE)
Major intersections Ampang–Kuala Lumpur Elevated Highway Ampang-Kuala Lumpur Elevated Expressway (AKLEH)
Jalan Mamanda 11
B31 Jalan Ampang
Jalan Bukit Indah Utama
Jalan Taman Putra
B62 Jalan Ampang-Hulu Langat
Cheras–Kajang Expressway Cheras-Kajang Expressway
East–West Link Expressway Kuala Lumpur-Seremban Expressway
South end Shah Alam Expressway Shah Alam Expressway at Sungai Besi, Kuala Lumpur
Location
CountryMalaysia
Primary
destinations
Bukit Jalil, Sri Petaling, Sungai Besi, Cheras, Pandan Indah, Hulu Langat, Ampang, Ulu Kelang
Highway system
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.