MRT Circle Line

The MRT 3, MRT Line 3 or MRT Circle Line is a proposed thirteenth rail transit line, the third Mass Rapid Transit line and the fourth fully automated and driverless rail system in the Klang Valley, Malaysia. Once completed, this line would form the loop line of the Klang Valley Integrated Transit System. The director of this project is currently Tuan Haji Mohd Yusof Kasiron. The circle line will be numbered 13.

MRT Circle Line
13
Overview
Native nameMRT Laluan Lingkaran
StatusPlanned
OwnerMRT Corp
Line number13
LocaleKlang Valley
Termini
Stations31 + 2 provisional
Websitemymrt.com.my
Service
TypeRapid transit
System Rapid KL
ServicesCircle route
Operator(s)Rapid Rail
Depot(s)Ayer Panas Depot
Taman Midah Depot
History
Planned openingPhase 1: December 2028
Phase 2: 2030
Technical
Line length50.8 km (31.6 mi)
Elevated: 40.1 km (24.9 mi)
Underground: 10.7 km (6.6 mi)
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification750 V DC third rail
Conduction systemAutomated and driverless
Operating speed100 km/h (62 mph)
Route map

MRT3 Official Map
MRT Circle Line
Jalan Kuching
Titiwangsa 
Dutamas
Kampung Puah
Taman Sri Sinar
Jalan Langkawi
Bukit Segambut
Ayer Panas Depot
Mont Kiara
Danau Kota
Sri Hartamas
Setapak
Rejang
Bukit Kiara
Bukit Kiara
Selatan
Setiawangsa
AU2
UM
Taman Hillview
Universiti
Tasik Ampang
Pantai Permai
Kampung Pandan
Pantai Dalam
Pandan Indah
Jalan Klang Lama
Taman Kencana
Kuchai
Taman Midah Depot
Salak Jaya
Taman Cheras
Salak Selatan
Taman Midah
Sri Permaisuri
Jalan Yaacob Latif

It is one of three planned mass rapid transit (MRT) rail lines under the Klang Valley Mass Rapid Transit Project by MRT Corp. The MRT Circle Line is expected to form a loop line circling but not entering Kuala Lumpur's central business district, while linking up the radial rail lines. Interest in building the line resurfaced in early 2015; the project was shelved by former Prime Minister Mahathir Mohamad in May 2018 but was later on revived in November 2020. Constructions are expected to begin in early 2023 and slated for full completion by 2030, while operations for the first phase will commence in the year 2028. The estimated construction cost is expected to be in line with the MRT Putrajaya Line which will be around RM31 billion while the land acquisition cost is estimated to be at RM8.4 billion.

With 50.8 km (31.6 mi) of rail alignment, a total of 33 stations, which will consist of 26 elevated and 7 underground stations will be built. The circle line is expected to stretch while forming a loop from Bukit Kiara to PPUM and it will include densely populated areas such as Mont Kiara, Segambut, KL Metropolis, Titiwangsa, Setapak, Setiawangsa, Ampang, Salak South, Pandan Indah, Pantai Dalam, Cheras and Universiti Malaya.