Line 25 (Shenzhen Metro)

Line 25 of the Shenzhen Metro is a line under planning, which will connect across Shenzhen through the districts of Luohu, Longhua, Longgang and Bao'an for 38.5 kilometers and 30 stations. Construction is planned to begin in 2023. The first phase of Line 25 has entered Phase V planning, and will run from Jihua Hospital in Longgang District to Shilong in Bao'an District, with 14 stations and 16.2 kilometers of track. The line is proposed to use 6 car type B trains.

Line 25
25
Overview
StatusUnder planning
LocaleShenzhen, Guangdong
Termini
  • Jihua Hospital (Phase 1)
    Future: Wenjindu
  • Shilong (Phase 1)
    Future: Shiyan
Stations14 (Phase 1)
Service
TypeRapid transit
SystemShenzhen Metro
Services1
Operator(s)SZMC (Shenzhen Metro Group)
Technical
Line length16.2km (Phase 1)
CharacterUnderground
Operating speed80km/h
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.