Kajang line

The MRT Kajang line (KGL), previously known as the Sungai Buloh–Kajang line (SBK), is a Mass Rapid Transit (MRT) line servicing the Klang Valley, Malaysia. It is the second fully automated and driverless rail system in the Klang Valley region after the LRT Kelana Jaya Line. Owned by MRT Corp and operated as part of the RapidKL system by Rapid Rail, it forms part of the Klang Valley Integrated Transit System. The line is numbered 9 and coloured green on official transit maps.

Kajang line
A Siemens Inspiro EMU stock designed by BMW Group Designworks leaving KG14 Semantan station.
Overview
Native nameMRT Laluan Kajang
StatusFully operational
OwnerMRT Corp
Line number9 (green)
LocaleKlang Valley
Termini
Stations29 & 3 reserved
Websitemyrapid.com.my
Service
TypeMass Rapid Transit
System Rapid KL
ServicesKwasa DamansaraKajang
Operator(s)Rapid Rail
Depot(s)Sungai Buloh Depot and Kajang Depot
Rolling stockSiemens Inspiro
58 four-car trainsets
Width: 3.1 m (10 ft) - wide profile
Length: 90.18 m (295.9 ft)
Daily ridership203,709 (2023)
Ridership66.5 million (2023)
History
OpenedPhase 1:
16 December 2016 (2016-12-16)
Sungai Buloh  KG01 Semantan  KG14 
Phase 2:
17 July 2017 (2017-07-17)
Muzium Negara  KG15 Kajang  KG31 
Technical
Line length47 km (29 mi)
Elevated: 37.5 km (23.3 mi)
Underground: 9.5 km (5.9 mi)
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification750 V DC third rail
Conduction systemAutomated and driverless
Operating speed100 km/h (62 mph)
Route map

KG04
Kwasa Damansara
KG05
Kwasa Sentral
KG05A
Teknologi
(provisional)
KG06
Kota Damansara
KG07
Surian
KG08
Mutiara Damansara
KG09
Bandar Utama
KG10
Taman Tun Dr Ismail-Deloitte
KG12
Phileo Damansara
KG12A
Bukit Kiara Selatan
(provisional)
KG13
Pavillion Damansara Heights-
Pusat Bandar Damansara
KG14
Semantan
KG15
Muzium Negara
Kuala Lumpur
KG16
Pasar Seni
KG17
Merdeka
AG8
SP8
MR6
Bukit Bintang
KG18A
Pavillion Kuala Lumpur-Bukit Bintang
KG20
Tun Razak Exchange-Samsung Galaxy
KG21
Cochrane
KG22
AEON-Maluri
AG13
KG23
Taman Pertama
KG24
Taman Midah
KG25
Taman Mutiara
KG26
Taman Connaught
KG27
Taman Suntex
KG28
Sri Raya
KG29
Bandar Tun Hussein Onn
KG30
Batu 11 Cheras
KG31
Bukit Dukung
KG32
Taman Mesra
(provisional)
KG33
Sungai Jernih
KG34
Stadium Kajang
KG35
Kajang

Interchange stations

integrated paid area
single fare trip
non-integrated paid area
multiple fare trips
interchange within same building
or cross-platform interchange

It is one of three planned MRT rail lines under the Klang Valley Mass Rapid Transit Project by MRT Corp. Phase 1 operations between Sungai Buloh and Semantan commenced service on 16 December 2016. Phase 2 operations between Muzium Negara and Kajang was opened on 17 July 2017, as a free shuttle service, by former Malaysian Prime Minister, Dato' Seri Najib Tun Razak in a ceremony at the Tun Razak Exchange station. Full revenue service between Sungai Buloh and Kajang began the following day.

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.