High Speed 1

High Speed 1 (HS1), legally the Channel Tunnel Rail Link (CTRL), is a 109.9-kilometre (68.3-mile) high-speed railway linking London with the Channel Tunnel.

High Speed 1
High Speed 1 approaching the Medway Viaducts
Overview
OwnerUK Government
under concession to: HICL Infrastructure, Equitix, National Pension Service of Korea (until 2040)
Locale
Termini
Stations4
Websitehighspeed1.co.uk
Service
TypeHigh-speed rail
SystemNational Rail
Operator(s)DB Cargo UK, Eurostar, Southeastern
History
Opened
  • 2003 (Section 1)
  • 2007 (Section 2)
Technical
Line length109.9 km (68.3 mi)
Number of tracksDouble track throughout
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Loading gaugeUIC GC
ElectrificationOverhead line, 25 kV 50 Hz AC
Operating speed300 km/h (190 mph)
SignallingTVM-430, KVB, AWS, TPWS
Route map

(Click to expand)
High Speed 1
(Channel Tunnel Rail Link)
0 km
0 mi
London St Pancras
International
London King's Cross
London Tunnel 1
7.5 km
4.7 mi
9 km
6 mi
Stratford International
London Tunnel 2
10 km
6 mi
21 km
13 mi
Ripple Lane freight connection
Rainham viaduct
0.5 km
0.3 mi
27 km
17 mi
Aveley viaduct
over LT&S
1.0 km
0.6 mi
30 km
19 mi
Thurrock viaduct A282
1.2 km
0.7 mi
32 km
20 mi
Thames Tunnel
2.5 km
1.6 mi
37 km
23 mi
Ebbsfleet International
Section 1
Section 2
boundary
39 km
24 mi
Fawkham Junction link line
50 km
31 mi
1.2 km
0.7 mi
54 km
34 mi
3.2 km
2 mi
Lenham Heath passing loop
88 km
55 mi
1.5 km
0.9 mi
90 km
56 mi
Ashford International
Ashford CTRL-DS Depot
91 km
57 mi
Ashford Flyover
1.5 km
0.9 mi
106 km
66 mi
108 km
67 mi
High Speed 1 / Network Rail
Getlink
Cheriton Shuttle Terminal
110 km
68 mi

It is part of the line carrying international passenger traffic between the United Kingdom and mainland Europe; it also carries domestic passenger traffic to and from stations in Kent and east London, and continental European loading gauge freight traffic. From the Channel Tunnel, the line crosses the River Medway, and tunnels under the River Thames, terminating at London St Pancras International station on the north side of central London. It cost £6.84 billion to build and opened on 14 November 2007. Trains run at speeds of up to 300 km/h (190 mph) on HS1. Intermediate stations are at Stratford International in London, Ebbsfleet International in northern Kent and Ashford International in southern Kent.

International passenger services are provided by Eurostar International, with journey times from London St Pancras International to Paris Gare du Nord in 2 hours 15 minutes, and London St Pancras International to Brussels South/Bruxelles-Midi/Brussel Zuid in 1 hour and 51 minutes. As of November 2015, Eurostar uses a fleet of 27 Class 373/1 multi-system trains capable of 300 km/h (190 mph) and 320 km/h (200 mph) Class 374 trains. Domestic high-speed commuter services serving the intermediate stations and beyond began on 13 December 2009. The fleet of 29 Class 395 passenger trains reach speeds of 225 km/h (140 mph). DB Cargo UK run freight services on High Speed 1 using adapted Class 92 locomotives, enabling flat wagons carrying continental-size swap body containers to reach London for the first time.

The CTRL project saw new bridges and tunnels built, with a combined length nearly as long as the Channel Tunnel itself, and significant archaeological research undertaken. In 2002, the CTRL project was awarded the Major Project Award at the British Construction Industry Awards. The line was transferred to government ownership in 2009, with a 30-year concession for its operation awarded to a consortium of Borealis Infrastructure (part of Ontario Municipal Employees Retirement System) and Ontario Teachers' Pension Plan in November 2010.

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.