I created rman backup level 0 on monday -> succeeded , level 1 on tuesday -> succeeded ,level 1 on wednessday -> failed
My doubts are 1)after the failed schedule which level (0/1/cumulative) of backup i have to take to make sure my database integrity ? 2)Shall I need to keep the failed schedule data or I can delete ?