When I do Track Changeset in tfs 2010, then in branch visualisation, I only get to see that selected changeset. However in examples all over the web, I have seen multiple changesets being shown in the hierarchy and Timeline views. Any idea?
What I have got is a main branch and from that I created a dev branch. Then i perform two changsets on dev branch. Now when i do View History on dev branch and select any one of the changeset and perform Track Changeset, then it only shows me that changeset, which is a bit odd because in the timeline view i should be able to see multiple changesets in a time range. Any idea?
Nabeel