struggling with this one a little bit, want to draw a line with a "gaps" something like that:
but whatever i did so far chart either skips "missing days" and joins "last before gap" and "first after gap" either interprets values as 0 (NaN, null tested). Is it even possible to have a "gap" there?
examples: