Issue: We have created a MS Flow to trigger, when an item is created in SharePoint list (On-Prem) and in flow (On-Cloud) returns the date field value as One day before of actual date value.
eg: If I have a Due Date field in SharePoint List and created new items with a Due Date valueas 6/28/2019, but at the time of Flow trigger it returns the Due Date value as 6/27/2019.
And I have configured the Sharepoint App server(On-Prem), Database server(On-Prem), MS-Flow (Online) to IST time zone, but still I'm facing the issue.
Regards, Tharma KS