I'm beginner in UML
and try understand it. Now I read UML Demystified
. There is this sentence:
A merge node doesn't exit until all flows have arrived at the merge node.
But there is a figure titled as Figure 15.12 Activity node example (where the arrowed lines are the only non-activity node symbols)
in www.omg.org/spec/UML/2.5/Beta2:
Now I think if above sentence is true, above diagram says Activity
will be block by merge
node; because arriving all flows is impossible; because an order only can be rejected or accepted.
Now I want to know is quoted sentence is incorrect or am I misunderstanding somethings?