-1

I defined 2 sub-projects to create 2 jars for 2 packages. Can I create 1 sub-projects with 2 packages below? thanks

//subproject for domain package so that AWS lambda can consume the jar
lazy val domainProject = (project in file("domain"))
  .enablePlugins(AssemblyPlugin)
  .settings(assemblyJarName in assembly := "domainPackage.jar")

//subproject for util package so that AWS lambda can consume the jar
lazy val utilProject = (project in file("util"))
  .enablePlugins(AssemblyPlugin)
  .settings(assemblyJarName in assembly := "utilPackage.jar")
  .dependsOn(domainProject)
David
  • 69
  • 3
  • 7

1 Answers1

0

You have already a root project which aggregates domainProject and utilProject. If you want to have a deeper project hierarchy, then I also asked for that (in Is it possible to manage a hierarchical product structure in SBT which has more than just one level?) - this is not possible....

Wolfgang Liebich
  • 400
  • 2
  • 12