Is it possible to check whether a SharePoint (actually WSS 3.0) timer job has run when it was scheduled to ?
Reason is we have a few daily custom jobs and want to make sure they're always run, even if the server has been down during the time slot for the jobs to run, so I'd like to check them and then run them
And is it possible to add a setting when creating them similar to the one for standard Windows scheduled tasks ... "Run task as soon as possible after a scheduled start is missed" ?