My Scenario is I have 4 batches in a my Mule flow. One of the batch say batch 1 loads records of say 10,000 but then i decided to force stop the batch. Now i decided to run batch No. 2 in the same XML. The batch 2 runs but the batch 1 records which were earlier loaded also gets run. Is this a bug or is there are a configuration to prevent this.
Asked
Active
Viewed 2,363 times