In my environment I have exchange 2007 sp2 with 7 DB's in a CCR configuration. After trying to switch from the primary node to the passive node for maintenance, an error occurred. Now the primary node is active and I need to reseed several DB's to the passive node.
My question is: can I reseed multiple DB's at the same time, or should I do them one by one? Any advise? Thanks in advance for any assistance