My backup system is currently shut down do the library being broken. I am going to attempt to repair the library, but want to make sure none of the current data that is past the retention period gets over written. Is there a simple way that I can start netbackup, but put a halt on any back processes before they start?
Asked
Active
Viewed 166 times
2
-
I did cancel all jobs from the GUI, but wondering if there something I can do make sure no more start. I Don't think any of the policy's have an open window right now, but wondering what additional lock I can do other than the physical switch on the tapes. – Kyle Brandt Apr 06 '10 at 12:39
1 Answers
2
Scheduled jobs can be prevented with:
bin\admincmd\nbpemreq -suspend_scheduling
bin\admincmd\nbpemreq -resume_scheduling

Kyle Brandt
- 83,619
- 74
- 305
- 448