USS Perch (SS-176)

USS Perch (SS-176) - a Porpoise-class submarine, was the first ship of the United States Navy to be named for the perch.

History
United States
BuilderGeneral Dynamics Electric Boat, Groton, Connecticut
Laid down25 February 1935
Launched9 May 1936
Sponsored byMrs. Thomas Withers
Commissioned19 November 1936
Stricken24 June 1942
FateScuttled in the Java Sea on 3 March 1942 after being damaged by Japanese destroyers; wreck illegally scrapped.
General characteristics
Class and typePorpoise-class diesel-electric submarine
Displacement1,350 long tons (1,370 t) standard, surfaced, 1,997 long tons (2,029 t) submerged
Length298 ft (91 m) (waterline), 300 ft 6 in (91.59 m) (overall)
Beam26 ft (7.9 m)
Draft15 ft (4.6 m)
Propulsion4 × Winton Model 16-201A 16-cylinder two-cycle diesel engines, 1,300 hp (0.97 MW) each, driving electrical generators through reduction gears, 2 × 120-cell Gould AMTX33HB batteries, 8 × General Electric electric motors, 538 hp (401 kW) each, 2 × General Motors six-cylinder four-cycle 6-241 auxiliary diesels
Speed19.25 kn (35.65 km/h) surfaced, 8.75 kn (16.21 km/h) submerged
Range11,000 nmi (20,000 km) @ 10 kn (19 km/h), (bunkerage 92,801 US gal (351,290 L))
Endurance10 hours @ 5 kn (9.3 km/h), 36 hours @ minimum speed submerged
Test depth250 ft (76 m)
Complement
  • As Built: 5 officers, 45 enlisted
  • 1945: 8 officers, 65 enlisted
Armament6 × 21 inch (533 mm) torpedo tubes (four forward, two aft; 16 torpedoes), 1 × 4 in (100 mm)/50 caliber deck gun, 4 × 0.3 cal (7.62 mm) machineguns (2x2)
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.