Toronto subway

The Toronto subway is a rapid transit system serving Toronto and the neighbouring city of Vaughan in Ontario, Canada, operated by the Toronto Transit Commission (TTC). As of September 2023, the subway system is a rail network consisting of three heavy-capacity rail lines operating predominantly underground. As of December 2022, three new lines are under construction: two light rail lines (one running mostly below ground, the other running mostly at-grade) and one light metro line (running both underground and on elevated guideways).

Toronto subway
Subway train at Museum station
Overview
Owner
Locale
Transit typeRapid transit
Number of lines3 (plus 3 under construction)
Number of stations70 (plus 60 under construction)
Daily ridership970,600 (weekdays, Q3 2023)
Annual ridership235,740,000 (2022)
Operation
Began operationMarch 30, 1954 (1954-03-30)
Operator(s)Toronto Transit Commission
Number of vehicles
  • 830 heavy rail cars
  • 66 work cars
Train length
  • 6 cars (Lines 1 and 2)
  • 4 cars (Line 4)
  • 3 cars (Line 5)
Headway
  • 2 min 50 s – 6 min (Line 1)
  • 3 min – 6 min (Line 2)
  • 5 min 30 s (Line 4)
Technical
System length70.1 km (43.6 mi)
63.2 km (39.3 mi) (under construction)
Track gauge
  • 4 ft 10+78 in (1,495 mm) (Lines 1, 2 and 4)
  • 1,435 mm (4 ft 8+12 in) (Lines 5 and 6)
Electrification
System map
Vaughan
Don Mills
Highway 407
Leslie
Pioneer Village
Bessarion
York University
Bayview
Finch West
Finch
Downsview Park
North York Centre
Sheppard West
Sheppard–Yonge
Wilson
York Mills
Yorkdale
Lawrence
Lawrence West
Eglinton
Glencairn
Davisville
Eglinton West
St. Clair
St. Clair West
Summerhill
Dupont
Rosedale
Kipling
Islington
Royal York
Old Mill
Kennedy
Jane
Warden
Runnymede
Victoria Park
High Park
Main Street
Keele
Woodbine
Dundas West
Coxwell
Lansdowne
Greenwood
Dufferin
Donlands
Ossington
Pape
Christie
Chester
Bathurst
Broadview
Spadina
Castle Frank
St. George
Sherbourne
Bay
Bloor–Yonge
Museum
Wellesley
Queen's Park
College
St. Patrick
Dundas
Osgoode
Queen
St. Andrew
King
Union

Yonge–University
Sheppard

In 1954, the TTC opened Canada's first underground rail line, then known as the "Yonge subway", under Yonge Street between Union Station and Eglinton Avenue with 12 stations. As of 2023, the network encompasses 70 stations and 70.1 kilometres (43.6 mi) of route. In 2022, the system had a ridership of 235,740,000, or about 970,600 per weekday as of the third quarter of 2023, making it the busiest rapid transit system in Canada in terms of daily ridership. There are 60 stations under construction as part of three new lines, two light rail lines and one light metro line, and two extensions to existing lines.

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.