Sweetwater Wind Farm

The Sweetwater Wind Farm is a 585.3-megawatt (MW) wind farm in Nolan County, Texas. The facility includes 392 wind turbines and was fully commissioned by 2007. The electricity is being sold to Austin Energy and to CPS Energy of San Antonio.

Sweetwater Wind Farm
Sweetwater Wind Farm
CountryUnited States
LocationTexas
Coordinates32°21′38″N 100°20′20″W
StatusOperational
Commission date2007
Owner(s)Duke Energy
Infigen Energy
Wind farm
TypeOnshore
Power generation
Units operational392
Nameplate capacity585.3 MW
Capacity factor34.3% (average 2008-2017)
Annual net output1,760 GW·h
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.