Sunbury line

The Sunbury line is a commuter railway line in the city of Melbourne, Victoria, Australia. Operated by Metro Trains Melbourne, it is the city's fifth longest metropolitan railway line at 40.3 kilometres (25.0 mi). The line runs from Flinders Street station in central Melbourne to Sunbury station in the north, serving 18 stations via North Melbourne, Sunshine, St Albans, and Watergardens. The line operates for approximately 19 hours a day (from approximately 5:00 am to around 12:00 am) with 24 hour service available on Friday and Saturday nights. During peak hour, headways of up to 5 minutes are operated with services every 20–30 minutes during off-peak hours. Trains on the Sunbury line run with a two three-car formations of Comeng or Siemens Nexas trainsets.

Sunbury
Platforms at Diggers Rest station on the Sunbury line.
Overview
Service typeCommuter rail
SystemMelbourne railway network
StatusOperational
LocaleMelbourne, Victoria, Australia
Predecessor
  • Sunbury (1859–1861)
  • Woodend (1861–1862)
  • Bendigo (1862–2012)
  • St Albans ^ (1921–2002)
  • Sydenham ^ (2002–2012)
^ are electric services
First service10 February 1859 (1859-02-10)
Current operator(s)Metro Trains
Former operator(s)
Route
TerminiFlinders Street
Sunbury
Stops18 (including City Loop stations)
Distance travelled40.3 km (25.0 mi)
Average journey time49 minutes (not via City Loop)
Service frequency
  • 5–20 minutes weekdays peak
  • 20 minutes weekdays off-peak
  • 20 minutes weekend daytime
  • 30 minutes nights
  • 60 minutes early weekend mornings
Line(s) usedDeniliquin
Technical
Rolling stockComeng, Siemens, HCMT
Track gauge1,600 mm (5 ft 3 in)
Electrification1500 V DC overhead
Track owner(s)VicTrack

The Victorian Railways began services in February 1859 on the line originally built to serve the town of Bendigo by the Melbourne, Mount Alexander and Murray River Railway Company. The line was progressively electrified overtime, with electrification to St Albans in 1921, Sydenham in 2002, and to Sunbury in 2012.

Since the 2000s, due to the heavily utilised infrastructure of the Sunbury line, improvements and upgrades have been made. Works have included replacing sleepers, upgrading signalling technology, two line extension projects, the construction of new stations, the removal of level crossings, the introduction of new rolling stock, and station accessibility upgrades.

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.