STS-51-B

STS-51-B was the 17th flight of the NASA Space Shuttle program and the seventh flight of Space Shuttle Challenger. The launch of Challenger on April 29, 1985, was delayed by 2 minutes and 18 seconds, due to a launch processing failure. Challenger was initially rolled out to the pad to launch on the STS-51-E mission. The shuttle was rolled back when a timing issue emerged with the TDRS-B satellite. When STS-51-E was canceled, Challenger was remanifested with the STS-51-B payloads. The shuttle landed successfully on May 6, 1985, after a week-long mission.

STS-51-B
Overmyer, Lind, van den Berg, and Thornton in Spacelab Module LM1 during flight
NamesSpace Transportation System-17
Spacelab 3
Mission typeMicrogravity research
OperatorNASA
COSPAR ID1985-034A
SATCAT no.15665
Mission duration7 days, 0 hour, 8 minutes, 46 seconds (achieved)
Distance travelled4,651,621 km (2,890,383 mi)
Orbits completed111
Spacecraft properties
SpacecraftSpace Shuttle Challenger
Launch mass111,980 kg (246,870 lb)
Landing mass96,373 kg (212,466 lb)
Payload mass15,610 kg (34,410 lb)
Crew
Crew size7
Members
Start of mission
Launch dateApril 29, 1985, 16:02:18 UTC
RocketSpace Shuttle Challenger
Launch siteKennedy Space Center, LC-39A
ContractorRockwell International
End of mission
Landing dateMay 6, 1985, 16:11:04 UTC
Landing siteEdwards Air Force Base,
Runway 17
Orbital parameters
Reference systemGeocentric orbit
RegimeLow Earth orbit
Perigee altitude346 km (215 mi)
Apogee altitude352 km (219 mi)
Inclination57.00°
Period91.50 minutes

STS 51-B mission patch

(Sitting): Robert F. Overmyer, Frederick D. Gregory
(Standing): Don L. Lind, Taylor G. Wang, Norman E. Thagard, William E. Thornton, Lodewijk van den Berg
 
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.