STS-109
STS-109 (SM3B) was a Space Shuttle mission that launched from the Kennedy Space Center on 1 March 2002. It was the 108th mission of the Space Shuttle program, the 27th flight of the orbiter Columbia and the fourth servicing of the Hubble Space Telescope. It was also the last successful mission of the orbiter Columbia before the ill-fated STS-107 mission, which culminated in the Columbia disaster.
The Hubble Space Telescope in Columbia's payload bay towards the end of the mission | |
Names | Space Transportation System-109 |
---|---|
Mission type | Hubble servicing |
Operator | NASA |
COSPAR ID | 2002-010A |
SATCAT no. | 27388 |
Mission duration | 10 days, 22 hours, 11 minutes, 09 seconds |
Distance travelled | 6,300,000 kilometres (3,900,000 mi) |
Orbits completed | 165 |
Spacecraft properties | |
Spacecraft | Space Shuttle Columbia |
Launch mass | 116,989 kg (257,917 lb) |
Landing mass | 100,564 kg (221,706 lb) |
Crew | |
Crew size | 7 |
Members | |
Start of mission | |
Launch date | 1 March 2002 11:22:02 UTC |
Launch site | Kennedy LC-39A |
End of mission | |
Landing date | 12 March 2002 09:33:10 UTC |
Landing site | Kennedy SLF Runway 33 |
Orbital parameters | |
Reference system | Geocentric |
Regime | Low Earth |
Perigee altitude | 486 km (302 mi) |
Apogee altitude | 578 km (359 mi) |
Inclination | 28.5 degrees |
Period | 95.3 minutes |
(L-R): Michael J. Massimino, Richard M. Linnehan, Duane G. Carey, Scott D. Altman, Nancy J. Currie, John M. Grunsfeld and James H. Newman. |
The Hubble Space Telescope (HST) was placed in orbit during mission STS-31 on 25 April 1990. Initially designed to operate for 15 years, plans for periodic service and refurbishment were incorporated into its mission from the start. After the successful completion of the second planned service mission (SM2) by the crew of STS-82 in February 1997, three of the telescope's six gyroscopes failed. NASA decided to split the third planned service mission into two parts, SM3A and SM3B. A fifth and final servicing mission, STS-125 (SM4) launched on 11 May 2009. The work performed during SM4 kept HST in operation through 2021.