Novovoronezh Nuclear Power Plant II

Novovoronezh Nuclear Power Plant II (NvNPPII; Russian: Нововоронежская АЭС II [pronunciation]) is a Russian nuclear power plant with two 1200 MW pressurized water reactors (VVER) located in Voronezh Oblast. The power plant is built on the same site as the present Novovoronezh Nuclear Power Plant.

Novovoronezh Nuclear Power Plant II
The plant's cooling towers as of mid 2016
Official nameНововоронежская АЭС II
CountryRussia
LocationVoronezh Oblast
Coordinates51°15′53.964″N 39°12′41.22″E
StatusOperational
Construction beganUnit 1: 24 June 2008
Unit 2: 12 July 2009
Commission dateUnit 1: 27 February 2017
Unit 2: 1 November 2019
Construction cost 250 billion (2009) – between US$ 6.8 billion and US$ 8.7 billion at 2009 exchange rates
Owner(s)Rosenergoatom
Operator(s)Rosenergoatom
Nuclear power station
Reactor typeVVER
Reactor supplierAtomstroyexport
Cooling towers2 × Natural Draft
Cooling sourceDon River
Power generation
Units operational1 × 1180 MW
1 × 1150 MW
Make and modelVVER-1200/392M (AES-2006)
Nameplate capacity2330 MW
External links
Websitehttps://rosenergoatom.ru/en/npp/novovoronezh-npp/
CommonsRelated media on Commons

Unit 1 started commercial operation in 2017, and was the first Generation III+ nuclear reactor in the world. Unit 2 was connected to the grid in 2019.