North–South connection

The North–South connection (French: Jonction Nord-Midi, Dutch: Noord-Zuidverbinding) is a railway link of national and international importance through central Brussels, Belgium, that connects the major railway stations in the city. It is line 0 (zero) of the Belgian rail network. With 1200 trains a day, it is the busiest railway line in Belgium and the busiest railway tunnel in the world. It has six tracks and is used for passenger trains, or rarely for a maintenance train when work is to be done on the railway infrastructure inside the North–South connection itself, but not for freight trains. It is partially underground (around Brussels-Central railway station) and partially raised above street level.

Brussels North–South connection
The North–South connection (bold black)
in relation to other Brussels railway and metro lines
Overview
StatusOperational
LocaleBelgium
Termini
Service
Operator(s)SNCB/NMBS
History
Opened1952
Technical
Line length3.8 km (2.4 mi)
Number of trackssix tracks
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification3 kV DC
Route map

km
0.0
Brussels-North
0.7
Brussels-Congress
1.3
Brussels-Central
2.0
Brussels-Chapel
2.6
Brussels-South
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.