New Darnytskyi Bridge

The New Darnytskyi Bridge (Ukrainian: Новий Дарницький міст) is a combined road and railroad bridge in Kyiv, the capital of Ukraine. It spans across the Dnieper River connecting the left and right banks of the city, the Darnytsia and Holosiiv districts of Kyiv, respectively. The bridge carries a double track rail line and is built to accommodate six lanes of road traffic.

New Darnytskyi Bridge

Новий Дарницький міст
New Darnytskyi Bridge pictured from its road deck looking eastwards.
Coordinates50°24′58″N 30°35′11″E
CarriesRoad traffic, railway
CrossesDnieper River
LocaleKyiv, Ukraine
Official nameЗалізнично-автомобільний перехід у м. Києві
OwnerUkraine
Maintained byUkrzaliznytsia
Preceded byDarnytskyi Railroad Bridge
Characteristics
Designcantilever
MaterialConcrete, steel
Total length1,100 metres (3,600 ft)
History
Engineering design byKyivdniprotrans
Constructed byPlaneta-Mist
Construction start2004
Construction endJuly 2023
Opened2011
Inaugurated2010
Location

The bridge was completed in July 2023, but operated in reduced capacity for months before, lacking road connection ramps from some directions. Additional railroad links to match the new bridges' capacity are also being constructed. The bridge's expected capacity is 60,000 vehicles and 120 pairs of trains per day, which will serve as a major relief for both the Kyiv road and bridge network and as well as Ukraine's Ukrzaliznytsia national rail system.

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.