Metro Purple Line (Minnesota)

The Metro Purple Line, formerly known as the Rush Line Corridor, is a proposed bus rapid transit service that would run from Union Depot in downtown Saint Paul to the northeastern suburbs of Saint Paul. Along the corridor's 21 proposed stations there are 106,000 jobs within a 10-minute walk. The project is currently in an environmental analysis phase with further development, engineering, and construction expected to take at least six more years. Service would run 7-days a week with 10-minute headways in peak periods and 15-minute service at most other times. The corridor was named the Rush Line because it was originally planned to end in Rush City, Minnesota. After using the color purple since 2017, the route was officially named the Purple Line and became part of the Metro network on July 14, 2021.

Purple Line
Overview
SystemMetro
StatusPlanning Stages
Route
Route typeBus rapid transit
LocaleMinneapolis–St. Paul, Minnesota
StartWhite Bear Lake
EndDowntown St. Paul
Length15 miles
Stations21
Service
Operates55 mph (89 km/h) max
Ridership7,400 (2040 Projection)
 {{{previous_line}}}  {{{system_nav}}}  {{{next_line}}} 
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.