Line 5 (Chennai Metro)

The Red Line or Line 5 is one of the three lines of Chennai Metro, Phase 2 Project. The under construction line stretches from Madhavaram Milk Colony to Sholinganallur. The line will consist of 45 stations, of which 6 are underground, 1 is at grade and 38 are elevated. The government has announced feasibility studies to extend metro rail's corridor-5 from Koyambedu to Avadi via Thirumangalam, Mogappair and Ambattur. At present, the proposed corridor-5 links Madhavaram with Sholinganallur via Koyambedu, Alandur and Madipakkam.

Line 5 (Red Line)
Overview
StatusUnder Construction
OwnerCMRL
Termini
  • Madhavaram Milk Colony
  • Sholinganallur
Stations45
Service
TypeRapid transit
SystemChennai Metro
Operator(s)Chennai Metro Rail Limited
Technical
Line length44.6 km (27.7 mi)
Number of tracks2
Character5.8 km Underground and 38.8 km Elevated
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification25 kV 50 Hz AC overhead catenary
Operating speed80 km/h (50 mph)
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.