Line 5 (Chennai Metro)
The Red Line or Line 5 is one of the three lines of Chennai Metro, Phase 2 Project. The under construction line stretches from Madhavaram Milk Colony to Sholinganallur. The line will consist of 45 stations, of which 6 are underground, 1 is at grade and 38 are elevated. The government has announced feasibility studies to extend metro rail's corridor-5 from Koyambedu to Avadi via Thirumangalam, Mogappair and Ambattur. At present, the proposed corridor-5 links Madhavaram with Sholinganallur via Koyambedu, Alandur and Madipakkam.
Line 5 (Red Line) | |
---|---|
Overview | |
Status | Under Construction |
Owner | CMRL |
Termini |
|
Stations | 45 |
Service | |
Type | Rapid transit |
System | Chennai Metro |
Operator(s) | Chennai Metro Rail Limited |
Technical | |
Line length | 44.6 km (27.7 mi) |
Number of tracks | 2 |
Character | 5.8 km Underground and 38.8 km Elevated |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge |
Electrification | 25 kV 50 Hz AC overhead catenary |
Operating speed | 80 km/h (50 mph) |
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.