Line 4 (Chennai Metro)

The Orange Line or Line 4 is one of the three lines of Chennai Metro, Phase 2 Project . The under construction line stretches from Lighthouse to Poonamallee Bypass . The line will consist of 27 stations, out of which 9 are underground and 18 are elevated.

Line 4 (Orange Line)
Overview
StatusUnder Construction
OwnerCMRL
Termini
Stations27
Service
TypeRapid transit
SystemChennai Metro
Operator(s)Chennai Metro Rail Limited
Technical
Line length26.1 km (16.2 mi)
Number of tracks2
Character10.1 km Underground and 16.0 km Elevated
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification25 kV 50 Hz AC overhead catenary
Operating speed90 km/h (56 mph)