Line 4 (Chennai Metro)
The Orange Line or Line 4 is one of the three lines of Chennai Metro, Phase 2 Project . The under construction line stretches from Lighthouse to Poonamallee Bypass . The line will consist of 27 stations, out of which 9 are underground and 18 are elevated.
Line 4 (Orange Line) | |
---|---|
Overview | |
Status | Under Construction |
Owner | CMRL |
Termini |
|
Stations | 27 |
Service | |
Type | Rapid transit |
System | Chennai Metro |
Operator(s) | Chennai Metro Rail Limited |
Technical | |
Line length | 26.1 km (16.2 mi) |
Number of tracks | 2 |
Character | 10.1 km Underground and 16.0 km Elevated |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge |
Electrification | 25 kV 50 Hz AC overhead catenary |
Operating speed | 90 km/h (56 mph) |