Line 3 (Chennai Metro)
The Purple Line or Line 3 is one of the three lines of Chennai Metro, Phase 2 Project. The under construction line stretches from Madhavaram Milk Colony to SIPCOT-Siruseri. The line will consist of 47 stations, out of which 28 are underground and 19 are elevated.
Line 3 (Purple Line) | |
---|---|
Overview | |
Status | Under Construction |
Owner | CMRL |
Termini |
|
Stations | 47 |
Service | |
Type | Rapid transit |
System | Chennai Metro |
Operator(s) | Chennai Metro Rail Limited |
Technical | |
Line length | 45.4 km (28.2 mi) |
Number of tracks | 2 |
Character | 26.3 km Underground and 19.1 km Elevated |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge |
Electrification | 25 kV 50 Hz AC overhead catenary |
Operating speed | 80 km/h (50 mph) |