Kolkata Metro Line 2

Kolkata Metro Line 2, also known as the East-West Metro and Green Line, is a rapid transit line of the Kolkata Metro in the Indian state of West Bengal. It currently consists of an operational section between Salt Lake and Sealdah, and will eventually connect Howrah by going underneath the Hooghly River, with an eastern extension also planned for Teghoria. It would consist of 17 stations from Teghoria (Haldiram) in the east to Howrah Maidan in the west, of which 11 would be elevated and 6 would be underground, with a total distance of 22 km (14 mi). It is expected to derive a very high ridership since it will connect India's two largest commuter railway and long-distance railway terminals (Howrah and Sealdah) along with two of its largest business districts (BBD Bagh and Salt Lake Sector V). It will also connect the industrial hub of Kolkata i.e. Howrah and the IT hub of Kolkata i.e. Sector 5. Line 2 has India's biggest underwater metro tunnel along with the deepest metro shaft. In the deepest metro shaft, Howrah metro station will be the deepest metro station in India, at a depth of 33 meters. The first phase between Salt Lake Sector V and Salt Lake Stadium was inaugurated by Union Railway Minister Piyush Goyal on 13 February 2020 and commercial services started from 14 February 2020.

Kolkata Metro Line 2
Salt Lake Sector V - Howrah Maidan
BEML Kolkata metro rake in a platform
Overview
Status
  • Phase 1 – Operational
  • Phase 2 – Under Construction
  • Phase 3 – Proposed
OwnerKolkata Metro Rail Corporation Green line
LocaleKolkata Metropolitan Area, India
Termini
Connecting linesBlue Line Purple Line Orange Line
Stations8 (operational)
WebsiteKMRC
Service
TypeRapid transit
SystemKolkata Metro
Operator(s)Metro Railway, Kolkata
Depot(s)Central Park depot
Rolling stockBEML Limited
Daily ridership100,000 (1 million by 2035, when fully operational)
History
Opened13 February 2020 (2020-02-13)
Last extension11 July 2022 (2022-07-11)
Technical
Line length32.11 km (19.95 mi)
9.1 km (5.7 mi) (operational)
7.31 km (4.54 mi) (under construction)
15.7 km (9.8 mi) (proposed)(Underground: 11.04 km (6.86 mi)
Elevated: 21 km (13 mi))
Number of tracks2
Character
  • Underground – 6
  • Elevated – 11
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification750 V DC third rail
Operating speed80 km/h (50 mph) (design)
SignallingCommunications-based train control
Route Map

Teghoria
(Haldiram) Orange Line
Raghunathpur
Baguiati
Dum Dum Park
Kestopur
Salt Lake Sector-V
Karunamoyee
Central Park
City Center
Bengal Chemical
Salt Lake Stadium
Phoolbagan
Sir Gurudas
Banerjee Halt
Circular Canal
Sealdah crossover
Sealdah
Esplanade
Mahakaran
Howrah
Howrah Maidan
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.