Iida Line

The Iida Line (飯田線, Iida-sen) is a Japanese railway line connecting Toyohashi Station in Toyohashi, Aichi with Tatsuno Station in Tatsuno, Nagano, operated by Central Japan Railway Company (JR Central). The line links eastern Aichi Prefecture and southern Nagano Prefecture through northwestern Shizuoka Prefecture. It goes through steep mountains as well as cities such as Iida and Ina. The line was originally four different private railway lines, the first of which opened in 1897.

Iida Line
JR Central 313 Series train
Overview
Owner JR Central
LocaleAichi, Shizuoka, Nagano prefectures
Termini
Stations94
Service
TypeHeavy rail
History
Opened15 July 1897 (1897-07-15)
Last extension20 August 1937 (1937-08-20)
Technical
Line length195.7 km (121.6 mi)
Track gauge1,067 mm (3 ft 6 in)
Electrification1,500 V DC (overhead catenary)
Operating speed85 km/h (53 mph) (maximum)
40–50 km/h (25–31 mph) (curves)
25–35 km/h (16–22 mph) (diverging junctions)
Train protection systemATS-PT
Maximum incline4.0%
Route map

The line has an unusually high number of so-called Hikyō stations, or hikyo-eki, which have since lost their nearby communities due to depopulation. There are 94 such stations along the route. The line has been described as the "holy land for those who love touring hikyo-eki". The phrase was coined in 1999 by Takanobu Ushiyama and friends, for railroad stations that are isolated and little used.

Traveling the entire length of the 195.7 km (121.6 mi) line by local trains takes six hours.

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.