GSAT-18

GSAT-18 is an Indian communications satellite. Built by ISRO and operated by INSAT, it carries 24 C-band, 12 extended C-band, and 12 Ku-band transponders.

GSAT-18
Mission typeCommunications
OperatorINSAT
COSPAR ID2016-060A
SATCAT no.41793
WebsiteGSAT-18
Mission durationPlanned: 15 years
Elapsed: 7 years, 3 months, 26 days
Spacecraft properties
BusI-3K
ManufacturerISRO Satellite Centre
Space Applications Centre
Launch mass3,404 kg (7,505 lb)
Dry mass1,480 kg (3,263 lb)
Power6,474 watts
Start of mission
Launch date5 October 2016 (2016-10-05), ≈20:30 UTC
RocketAriane 5 ECA, VA-231
Launch siteGuiana Space Centre ELA-3
ContractorArianespace
Orbital parameters
Reference systemGeocentric
RegimeGeostationary
Longitude74° E
Perigee altitude35,750 km (22,214 mi)
Apogee altitude35,822 km (22,259 mi)
Inclination0.0616°
Epoch11 June 2017 01:46:00 UTC
Transponders
Band24 × C band
12 × extended C band
12 × Ku band
2 × Ku beacon
 

The satellite was launched on 5 October 2016 at approximately 20:30 UTC aboard an Ariane 5 ECA rocket from the Guiana Space Centre in Kourou, French Guiana. The launch vehicle inserted the satellite into a geosynchronous transfer orbit, and once in service it will occupy the orbital slot at 74° East longitude. The total cost of the satellite and launch services was about US$153 million.

GSAT-18 was originally scheduled to launch on 12 July 2016 alongside Japan's Superbird-8 satellite, but a shipping mishap which damaged Superbird-8 forced a delay in the launch schedule. Arianespace later paired GSAT-18 with Australia's Sky Muster II for a 4 October 2016 launch. The launch was delayed 24 hours to 5 October due to excessively high crosswinds at the launch site.

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.