The Concepcion–Clark Transmission Line (kənˌsɛpsiˈoʊn–klɑrk trænˈsmɪʃən laɪn)

Concepcion–Clark Transmission Line (Double circuit line with steel poles)
A portion of the transmission line in Concecpion, Tarlac.
Location
CountryPhilippines
ProvinceTarlac
Pampanga
Coordinates15°22′38″N 120°37′1″E
15°13′43″N 120°33′45″E
FromConcepcion Substation
Passes throughNew Clark City, Clark International Airport
ToClark Substation
Ownership information
OwnerNational Transmission Corporation (August 24, 2008–present)
OperatorNational Transmission Corporation (August 24, 2008–January 15, 2009)
National Grid Corporation of the Philippines (January 15, 2009–present)
Construction information
Cable layerTASCR/AS
CommissionedAugust 24, 2008 (August 24, 2008)
Technical information
TypeOverhead transmission line
Type of currentHVAC
No. of transmission towers211 (185 steel poles, 20 lattice towers, 2 portal towers and 4 H-frame poles)
AC voltage230 kV
No. of poles185
No. of circuits2

(abbreviated as 8LI1CON-CLK, 8LI2CON-CLK, CCTL or in pole's reference tags; 8LI1CON-CL1 and 8LI1CON-CL2) is a 230,000 volt, double-circuit transmission line in Tarlac and Pampanga, Philippines that connects Concepcion Substation of National Grid Corporation of the Philippines (NGCP) and Clark Substation of Clark Electric Distribution Corporation (CEDC).