Concepcion–Clark Transmission Line
The Concepcion–Clark Transmission Line (kənˌsɛpsiˈoʊn–klɑrk trænˈsmɪʃən laɪn)
Concepcion–Clark Transmission Line (Double circuit line with steel poles) | |
---|---|
A portion of the transmission line in Concecpion, Tarlac. | |
Location | |
Country | Philippines |
Province | Tarlac Pampanga |
Coordinates | 15°22′38″N 120°37′1″E 15°13′43″N 120°33′45″E |
From | Concepcion Substation |
Passes through | New Clark City, Clark International Airport |
To | Clark Substation |
Ownership information | |
Owner | National Transmission Corporation (August 24, 2008–present) |
Operator | National Transmission Corporation (August 24, 2008–January 15, 2009) National Grid Corporation of the Philippines (January 15, 2009–present) |
Construction information | |
Cable layer | TASCR/AS |
Commissioned | August 24, 2008 |
Technical information | |
Type | Overhead transmission line |
Type of current | HVAC |
No. of transmission towers | 211 (185 steel poles, 20 lattice towers, 2 portal towers and 4 H-frame poles) |
AC voltage | 230 kV |
No. of poles | 185 |
No. of circuits | 2 |
(abbreviated as 8LI1CON-CLK, 8LI2CON-CLK, CCTL or in pole's reference tags; 8LI1CON-CL1 and 8LI1CON-CL2) is a 230,000 volt, double-circuit transmission line in Tarlac and Pampanga, Philippines that connects Concepcion Substation of National Grid Corporation of the Philippines (NGCP) and Clark Substation of Clark Electric Distribution Corporation (CEDC).