Buffalo Gap Wind Farm
The Buffalo Gap Wind Farm is located in Nolan and Taylor Counties, about 20 miles (30 km) south west of Abilene, Texas. It was constructed in three phases and has a total wind generation capacity of 523.3 megawatts (MW).
Buffalo Gap Wind Farm | |
---|---|
Official name | Buffalo Gap Wind Farm |
Country | United States |
Location | 20 miles (30 km) south west of Abilene, Texas |
Coordinates | 32°18′38″N 100°8′57″W |
Status | Operational |
Commission date |
|
Owner(s) | AES Wind Generation |
Wind farm | |
Type | Onshore |
Power generation | |
Units operational | 296 turbines |
Make and model | Vestas V80-1.8 MW, GE SLE-1.5 MW, Siemens SWT-2.3 MW |
Nameplate capacity | 523.3 MW |
Capacity factor | 33.3% (average 2010-2017) |
Annual net output | 1,529 GW·h |
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.