Teardown is the process that occurs after a test has been run to reverse all the things that the test setup. This might include stopping processes that were started, deleting data that was created, uninstalling components that were installed etc.
Questions tagged [teardown]
104 questions
1
vote
1 answer
PHPUnit I need to tear down the 'require_once' call as it is overriding a helper function only for the test
I created a wrapper function in a helper file to wrap a globally used method, like getTimestamp(). The helper file is put in the same namespace as the file I am testing ('The model file'), a namespace like 'Project\Models\TeamName'. The hypothetical…

greg b
- 27
- 6
1
vote
3 answers
How to execute a sample just before thread shutdown in Jmeter?
Is there a way in Jmeter to execute a sample just before thread shutdown?
For example, I have a test plan that inserts data into a database and autocommit is disabled on the connection. Each thread spawns its own connection to the database. Plan…

Vader
- 3,675
- 23
- 40
1
vote
1 answer
How to define order for feature execution in Karate?
I have 14 features in total.
One of them is for cleaning (teardown), so I want that to run in the end.
But when I run my suite, it actually runs in the middle and hence breaks the suite.
How can we run the features in a specific order?

Sneha Shukla
- 373
- 1
- 4
- 19
1
vote
1 answer
Cypress tests not running
whenever I am trying to run cypress tests I am getting this error.
I have cloned spectrum repo and this is my first time I am trying to run cypress tests

Zus C
- 99
- 2
- 9
1
vote
2 answers
unittest's tearDown and setUp don't update the properties the same way
I'm writing some unit tests for which I have some preparation to do before every test, and which I should undo after each test. So I'm using setUp to prepare them, using a list to list the actions I've performed, and in the tearDown, I undo the…

BriceP
- 508
- 2
- 13
1
vote
0 answers
Runtime Error in middle of large test suite : No more threads can be created
We have a very large automation suite that takes a good bit of time to run. These are UI tests for a windows app, and we use LeanFT & NUnit. S it is not web we do not yet have any sort of parallel/grid solution up and running.
The whole suite has…

Tree55Topz
- 1,102
- 4
- 20
- 51
1
vote
1 answer
Robotframework Keyboard Interrupt cleanup
From what I can tell the docs recommend issuing a 'Ctrl-C' to abort an execution of a '.robot' file (test case/suite). I was wondering if there was a way to add a cleanup mechanism whenever this 'Ctrl-C' is issued? If not, can you suggest which…

ozn
- 1,990
- 3
- 26
- 37
1
vote
4 answers
Data Teardown using Entity Framework
I'm after some advice. I am working on a project using Entity Framework as the Orm. We are using a code-first approach throughout. We are using behaviour driven development too and have created a set of automated web tests using specflow and…

Nore Gabbidon
- 351
- 1
- 4
- 10
1
vote
0 answers
Python unittest: tearDownClass to remove file
I have unittests class that I have test methods. Now in in of the methods I temporarily create a file to compare with static file that is inside module. After tests are run, I want to delete that file
Now in setUp method, I have defined…

Andrius
- 19,658
- 37
- 143
- 243
1
vote
1 answer
Cleanup when suite got stopped in JMeter
I have a teardown element in JMeter which cleans up some test data. It currently runs after the actual test. However, if I notice some failures and stop the suite, then the clean up is not performed and I need to do it manually. Is there any way to…

user998692
- 5,172
- 7
- 40
- 63
1
vote
2 answers
How to run method after every NUnit test (even failure within teardown)
I am working on a test library using NUnit, and am generating a custom report while the tests run.
In the TearDown of my tests I call a method that will report the result of the test. It works just fine if the test passes, but is never reached if…

jacobvoller.com
- 476
- 7
- 28
1
vote
1 answer
How to write Teardown for RowEntryFixture or ColumnFixture in Fitnesse
I am using RowEntryFixture to process some data, at the end of it, I want to execute some code, how can i do that?
I am using fitnesse with C#

Nitin Chaudhari
- 1,497
- 16
- 39
1
vote
2 answers
SetUp/TearDown methods in sahi tests using junit framework
Is it possible to place the setup/teardown methods using JUnit framework in a single class (which would be my baseclass) so on test runs they methods are always called first/last? it would be in a similar way to which nunit tests can be…

jim7
- 213
- 1
- 2
- 6
1
vote
1 answer
In Robot Framework, in the test case teardown phase, how to check whether the current test case is fail or pass?
In Robot Framework test case, we can create Teardown phase to do clean-up activities.
| *Test Case* |
| testcase1 |
| | [Setup] | Setup Actions |
| | Do Something | Args |
| | Do Something | Args |
| | [Teardown] | Teardown Actions |
|…

userpal
- 1,483
- 2
- 22
- 38
1
vote
1 answer
jmeter tear down thread grop runs several times
I have next test plan:
Test Plan
- set up (1 thread 1 loop)
- Thread Group 1 (2 threads, 2 loops)
- Thread Group 2 (2 threads, 2 loops)
- Thread Group 3 (2 threads, 2 loops)
- tear down (1 thread 1 loop)
In tear down section I send an email…

user2686250
- 11
- 2