I'm not very experienced in R and I've been having an issue with geom_col(position = "identity") that I cannot figure out.
Here is some obfuscated data that still shows my issue and the code for my graph.
#Dataframe
print(colorsshapes, n = 30)
# A tibble: 30 x 4
# Groups: year, shape [15]
year shape color total
<int> <chr> <chr> <int>
1 2015 circle Red 101
2 2015 circle Blue 6960
3 2015 star Red 232
4 2015 star Blue 9436
5 2015 square Red 218
6 2015 square Blue 9417
7 2016 circle Red 146
8 2016 circle Blue 7041
9 2016 star Red 415
10 2016 star Blue 9702
11 2016 square Red 381
12 2016 square Blue 9653
13 2017 circle Red 167
14 2017 circle Blue 6890
15 2017 star Red 780
16 2017 star Blue 10277
17 2017 square Red 754
18 2017 square Blue 10231
19 2018 circle Red 306
20 2018 circle Blue 7067
21 2018 star Red 1066
22 2018 star Blue 10255
23 2018 square Red 1058
24 2018 square Blue 10233
25 2019 circle Red 457
26 2019 circle Blue 6304
27 2019 star Red 1886
28 2019 star Blue 10082
29 2019 square Red 1870
30 2019 square Blue 10057
#Graph
basic_hist <- colorsshapes %>%
ggplot(aes(x = shape, y = total, fill = color)) +
geom_col(position = "identity", color = "black") +
scale_x_discrete(name = "Shape",
breaks = c("star", "circle", "square"),
labels = c("Star", "Circle", "Square")) +
scale_y_continuous(name = "Total",
limits = c(0,10500)) +
scale_fill_manual (name = "Color",
breaks = c("Red", "Blue"),
labels = c("Red", "Blue"),
values = c("indianred1", "darkslategray3")) +
facet_wrap(~year, nrow = 1) +
geom_text (aes(x = shape, y = total, label = total), stat = "identity",
position = position_nudge(y = 200), show.legend = FALSE) +
theme(axis.title = element_text(face = "bold", size = 12),
axis.text.x = element_text(angle = 345, size = 12, hjust = 0, vjust = 1),
axis.title.x = element_text(margin = margin(t = 10, r = 2, b = 1, l = 2)),
legend.title = element_text(face = "bold", size = 12),
legend.text = element_text(size = 10),
panel.spacing = unit(0.5, "cm"),
strip.text = element_text(size = 12, face = "bold"))
R plots the taller bar first, making the smaller bar unseen. I'd rather not adjust the alpha levels because the legend won't perfectly match the color of the lighter bars. My supervisor also would prefer contrasting colors, which makes adjusting the alpha a little less aesthetically pleasing.
I've tried converting the fill variable to a factor and manually setting the labels. No luck. I've tried reordering the levels in the scale_fill_manual() call. No luck. I've tried variations of arrange() and sort() in the graph code. No luck. Any ideas?
Much appreciated!